References

TABOR TUNNEL, SEŽANA, SLOVENIA

In the Tabor tunnel in Sežana, we carried out all electrical engineering work as part of safety systems, signaling systems, traffic lights and tunnel lighting. Careful planning by the teams and excellent practical execution by the field teams resulted in a wonderful project.

Javna razsvetljava d.d. illuminated the 272 m long Tabor tunnel, carried out the associated electrical and construction works and performed all the necessary measurements, both electrical and lighting so that the tunnel could be put into use.

Technical data

Date of implementation: 2022

Illumination area: 272 m

Straževica tunnel

Straževica, SRB

For the company JP Putevi Srbije, we completely carried out electrical installations, installation of signaling equipment, installation of safety equipment and lighting of the facility in the Straževica tunnel in Serbia, 772 m long. Electric and light measurements were also carried out by JR.

Kastelec tunnel

Kastelec, SLO

Javna razsvetljava d.d. was actively involved in the replacement of electrical installations and equipment, the installation and connection of mechanical installations and the replacement of lighting in the Kastelec tunnel. In addition to the installations, we also upgraded the SCADA tunnel management system.

Karavanke tunnel

Karavanke, SLO

One of the largest projects in which the company Javna razsvetljava d.d. was present. was the Karavanke tunnel. We carried out the entire installation of lighting and signalling, in addition to the installation and assembly of certain hardware.